Air Date: 1990-09-03
Construction begins on a Cape Cod-style home being built in Marstons Mills, Massachusetts. Included: the lot is clear...
Air Date: 1990-09-10
A recycled "ell" is added,and a first-floor deck is built. Also: tips on ordering lumber.
Air Date: 1990-09-17
Bob visits Barbara Gooddale in her authentic antique Cape Cod house to get a feel for the style and practicality of t...
Air Date: 1990-09-24
A staircase is built and the second floor is toured. Also: Bob Vila visits a shingle plant in Delaware.
Air Date: 1990-10-01
Some demolition is done on the old ell to prepare it for renovation; ceiling joists and roof rafters go up in the new...
Air Date: 1990-10-08
A bulkhead is installed; a soffet, facia and drip edge are added to the front of the house. Also: asphalt shingles an...
Air Date: 1990-10-15
The old ell is joined to the new construction, with some demolition done to make room for a shed dormer and a slider ...
Air Date: 1990-10-22
Bob and Ryley install the pre-hung front door and visit Shepley Wood Products to see how it was made. Dean Fraser sho...
Air Date: 1990-10-29
Bob goes over the electrical wiring with John Hickey, cedar clapboards are put up, and Hand Cassidy explains insulati...
Air Date: 1990-11-05
Bob discusses the kitchen layout with designer Amy O'Haire, then visits her showroom. Claude Daigle demonstrates his ...
Air Date: 1990-11-13
Our contractor Ryley shows us how to put up the pine interior paneling in the living room; Bob checks out the furnace...
Air Date: 1990-11-19
Artisan Terry Maiche shows us two inexpensive ways to dress up a floor with paint: spattering and stenciling. Ryley b...
Air Date: 1990-11-26
Bob discusses landscaping with specialist Susan Hofer--sod, a gravel driveway, brickwork, fences, perennials. We tour...
Air Date: 1990-12-03
Now in Chicago, Bob takes a driving tour with realtor Catherine Caravette of our new neighborhood, Wicker Park, and o...
Air Date: 1990-12-10
Bob discusses plans with local architect Bill Bauhs, and takes a tour of downtown Chicago's striking modern buildings...
Air Date: 1990-12-17
Bob and Ron discuss the removal and shoring up of bearing walls, to be replaced by special engineered beams. We visit...
Air Date: 1990-12-24
The crew installs a Parallam beam in the living room and iron beams in the back masonry wall. Ron Gan and Bill Bauhs ...
Air Date: 1990-12-31
Scott Smith's excavation crew digs out the basement to make room for a basement slab. Bob discusses heating systems f...
Air Date: 1991-01-07
The concrete basement floor is poured, leveled, and screeded; our contractor Ron repairs a broken window pane the old...
Air Date: 1991-01-14
Bob goes downtown to the Merchandise Mart to see a selection of bathroom fixtures. Back at our greystone, plumber Dan...
Air Date: 1991-01-21
Drywall and plaster work is discussed. Also: a visit to a drywall plant in Delaware.
Air Date: 1991-01-28
A review of the project's budget and progress. Also: a trip to an appliance showroom, and the bathroom floor is prepp...
Air Date: 1991-02-03
Wooden floors are refinished and new windows are installed. Also: a visit to a light-fixtures store.
Air Date: 1991-02-10
Kitchen cabinets are installed and the landscaping work begins.
Air Date: 1991-02-17
Installed: a basement staircase. Also: a visit to a flooring plant.
Air Date: 1991-02-24
Kitchen countertops are mounted. Also: a tour of the home with an interior decorator.
Air Date: 1991-03-04
Bob and contractor Ron Gan look around our next projectan old deserted "coach house." Architectural historian Susan B...
Air Date: 1991-03-11
Bob discusses plans for the coach house with our architect, Mike Morgan, and with contractor Ron Gan; demolition begi...
Air Date: 1991-03-18
Bob tours architect Frank Lloyd Wright's studio and sees some houses Wright designed in Greater Chicago. Back at the ...
Air Date: 1991-04-01
The Eagle roofing crew strips several ancient layers of old roofing, and a section of the roof is removed to make roo...
Air Date: 1991-04-15
Bob tours the Hill Arboretum, an apartment project adapted for the physically challenged. Back at the coach house, a ...
Air Date: 1991-05-13
Bob tours the completed living room and dining room of the coach house, then reviews work done on the heating system....
Air Date: 1991-05-20
Bob installs the finishing touches in the coach house kitchen, including some galvanized steel features. We go outsid...
Air Date: 1991-05-27
Bob takes the grand tour of the finished coach house exterior with Ron, our contractor. We go inside to see the decor...